Skip to content

Comments and review

Comment at a moment, draw on the picture, mention people and resolve threads, ask for a review, see the activity, and name and restore earlier versions.

Comments are notes on a project for the people you make it with. Each one is at a moment in a sequence, over a stretch of it, or about the whole project, so whoever reads it can go straight to the frame it’s about. Draw on the picture to show what you mean, mention someone to tell them, and resolve a thread once it’s dealt with.

Comments are kept with projects on your account. A project that’s only on this device can’t have them until it’s saved there.

Open the comments

Click Comments in the timeline’s toolbar, press ShiftAltC, or choose Comments in the command palette. The panel opens beside the timeline. The button shows how many threads are open.

The panel is as tall as the timeline. When that’s short, the search and filters scroll with the threads, and the box for a new comment is one line until you click in it. To make it taller, drag the bar between the timeline and the viewer.

New comments, replies and changes from the others show in the panel on their own, within a few seconds. Offline, the panel shows the comments as they were, and new ones can be sent once you’re back online.

Comment at the playhead

  1. Put the playhead on the frame you want to talk about.
  2. Press ShiftC from anywhere in the editor, or click in the box at the foot of the panel. Playback pauses.
  3. Write what to change, and press Enter to send it. ShiftEnter starts a new line.

The comment is on the frame the playhead was on. Its time shows as hours, minutes, seconds and frames, such as 00:13:24:05, in the sequence’s own time.

To put it somewhere else, click the time above the box:

ChoiceWhere the comment goes
At the playheadThe frame the playhead is on when you send it. It follows the playhead until then.
Hold atThe frame the playhead is on now, wherever the playhead goes after.
From the in point to the out pointThe stretch between the sequence’s in and out points. Mark both first, with I and O.
The whole projectNo moment: about the project as a whole.

A comment can say up to 4,000 characters. A project can have up to 2,000 comments.

Draw on the picture

  1. Click Draw on the picture beside the box. Playback pauses, and the picture is the program monitor’s.
  2. Choose a tool: Pen, Arrow, Box or Ellipse, a color and a thickness.
  3. Draw over the picture. With an arrow, box or ellipse, hold Shift for 45° steps, a square or a circle.
  4. Click Done, or press Esc, then write the comment if you like, and send it.

Press CtrlZ to take back the last mark, or click Clear the drawing to start again. A comment can have up to 64 marks.

What’s drawn is on the frame the drawing was started on: move the playhead away and it’s hidden, and Go back returns to it. It’s drawn in the picture’s own terms, so it’s in the same place at any size or zoom.

Drawing waits while a tool has the picture, such as a mask or a shape being drawn, a frame being painted or a color being picked, while a version of the sequence is shown, and while the picture is compared with another. The marks drawn so far are kept for the comment.

Mention someone

Type @ and the start of a name, then pick them from the list with ↑, ↓ and Enter, or click them. The list has everyone who can open the project. Someone mentioned gets an email, unless they’ve turned those off (see Emails).

A mention shows the person’s name as it is now. Someone who’s left the workspace shows as a former member.

Threads

A comment and its replies are a thread. Click a thread, or its time, to go to its moment: the playhead goes there, paused, in its sequence, with what’s drawn with it over the picture. With a thread’s time focused, ↑ and ↓ move to the next one, and Esc lets the thread go.

  • Reply: write in the box under the thread and press Enter.
  • Resolve: mark the thread as dealt with. It moves from Open to Resolved. Reopen puts it back.
  • Edit: change what your own comment says, from its More menu. It shows as edited.
  • Copy link to comment: a link that opens the editor at the comment, for anyone who can open the project.
  • Delete: your own comments and replies, and on your own projects or as a workspace’s owner, anyone’s. Deleting a comment that has replies keeps the replies, under a note that it was deleted.

Replying to a resolved thread doesn’t reopen it.

Find a comment

Type in the search box to find comments by what they say or who said it. Choose Open, Resolved or All to see those threads. Filter and sort narrows them to threads you’re in, threads that mention you, or this sequence, and lists them as they come in the sequences or newest first.

To work through the open comments in order, choose Go to the next comment or Go to the previous comment in the command palette. Give them keys under Help › Keyboard shortcuts.

On the ruler

Each open thread in the sequence shows as a pin at the top of the ruler, in its writer’s color, and a comment over a stretch as a line along it. Hover over a pin to read it, and click it to go to the thread. Comments too close together to tell apart are one pin, with how many there are: click it again for the next.

Ask for a review

In a workspace, or in a project shared by email, ask the people you make it with to review it: each of them approves it or requests changes. The Review button in the editor’s top bar says where the review is:

  • Waiting on you: you’ve been asked, and haven’t decided since.
  • In review: waiting on others, with how many have approved it so far.
  • Changes requested: someone has requested changes. This shows until they approve it or take it back, whoever else has approved.
  • Approved: everyone in the review has approved it. Approved before changes means some of them did before it was last saved.

Click it, or choose Review the project in the command palette, to see who’s in the review, what each of them decided and when, and what they said.

To ask for a review:

  1. Click Review, then Ask for review….
  2. Tick the people to ask. Everyone in the workspace can be asked, owners, editors and reviewers, and everyone the project’s shared with.
  3. Add a note if you like, such as what to look at or by when, and click Ask.

Each of them gets an email with your note and a link that opens the project with its review showing. To ask someone again, click Ask again by their name. Remove takes them off the review; what they decided stays.

To review a project:

  1. Open it from the email, or click Review in the editor.
  2. Watch it, and comment where something should change.
  3. Write a note if you like, and click Approve or Request changes. With open threads, the review says how many, so you can check them first.

Whoever asked you gets an email saying what you decided. Change… lets you decide again, and Take back undoes it. Asked to review something you’d rather not, click Decline.

A decision is about the project as it was when it was made. Once someone saves a change to it, what was decided before shows as Before the latest changes: ask again to have it reviewed as it is now. Renaming the project, or moving it, doesn’t count as a change.

Reviews are for projects others can open: a workspace’s, and those shared by email. One of your own can’t have one until you share it, or move it into a workspace. On the projects page, each of a workspace’s projects shows where its review is, over its picture.

Clients can approve cuts of a project too, request changes to them or reject them, through a review link, with no account. What they decide is under the team’s review, by their name: see In the editor.

Activity

Click Activity in the review, or choose Project activity in the command palette, to see what’s been done to the project, newest first and by day: who made it, saved changes, renamed it and moved it, put it in the trash and restored it; who commented and resolved or reopened threads; and who asked for a review, and what was decided. Choose Edits, Comments or Review to see only those. Show by an event about comments goes to its thread.

Saves one after another by the same person are one event, saying how many. Activity is kept for a year, for projects on your account, both your own and a workspace’s.

Version history

Your account keeps earlier versions of each project on it as it’s saved: one when someone stops for a while, when someone else starts saving it, and every half hour while work goes on. Click Saved in the editor’s top bar, or choose Version history in the command palette, to see them, newest first and by day, with who saved each one.

Choose a version to see its picture, its frame size, frame rate and length, and what’s different:

  • Since then: what’s been changed since that version, which restoring it takes back.
  • In this version: what it changed from the version before it.

Each sequence says how much longer or shorter it is, which clips were added, deleted, moved, trimmed or changed, how titles and captions were reworded, and where in it the changes are, along a strip of its length.

To keep a version, name it: choose Name this version… in the command palette, or Name this version… by the version in the history, and type a name such as Picture lock. Other versions are normally kept for 30 days, and at most 100 of them; the newest automatic version is kept as the last undo point, while older automatic versions are trimmed sooner if the account or workspace needs their storage. Named ones are kept until they’re deleted. A project can have at most 50 named versions. Rename… changes a version’s name, and Remove name takes it off, after which the version is automatic again.

With a version chosen:

  • Restore this version makes the project what it was, keeping the project’s name. It’s an edit like any other, so Undo takes it back, and the version the project was at is kept in the history first.
  • Make a copy makes a new project from it, next to this one, and leaves this one as it is.
  • Delete version deletes it from the history.

To bring back one sequence alone, choose Since then: each sequence that’s different has Restore this sequence… and Open as a revision, and one deleted since has Bring it back. The rest of the project stays as it is. See Snapshots. To keep the project as it is now, choose Take snapshot… in the command palette: it names the version the project’s at.

Media deleted from the project since a version was saved comes back with it, from this computer’s storage. Where it’s not there any more, or on another computer, it’s missing: relink it to its files. Version history counts toward the account’s or workspace’s storage. Naming a version needs room for it; automatic versions are trimmed to the room available without stopping an ordinary project save. A project that’s only on this device has none until it’s on your account.

On your own projects, you can do all of this. In a workspace, its owners and editors can name versions, restore them and make copies; editors can delete only the versions they named, and owners can delete any. Reviewers can see the history, but can’t change it.

Emails

Oryvio emails you when someone mentions you in a comment, when someone replies in a thread you started or wrote in, when someone asks you to review a project, and when someone you asked approves it or requests changes, with what they said and a link to it. Turn each of them off in Settings, under Notifications.

Emails go only to a verified address, at most one email a thread every 15 minutes about replies, and at most 20 an hour. About a decision, at most one every 15 minutes from the same person, unless they change their mind. You aren’t emailed about what you did yourself, or about projects you can no longer open.

Who can comment and review

Anyone who can open a project can comment on it: you on your own projects, in a workspace, its owners, editors and reviewers, on any of its projects, and those a project’s shared with, on it. Reviewers, and those it’s shared with, can resolve the threads they started; owners and editors can resolve any.

In a workspace, its owners and editors can ask for a review, ask again and take people off it, as you can on a project of your own that’s shared. Anyone in it, and anyone it’s shared with, can approve a project or request changes, whether they were asked or not, and decline when they’re asked. Someone who leaves the workspace, or a project shared with them, is left out of its reviews, as if they’d never been asked.

Comments are about the project as it is: changing the edit doesn’t move them. Someone whose account is deleted shows as a former member, and what they said is kept.