Skip to content

Review links

Send a link to watch cuts of a project, comment on them and approve them, with no account; upload cuts, screen your edit live, and choose what it allows.

A review link lets anyone you send it to watch cuts of a project, comment on them at a frame, and approve them, request changes or reject them, with no account. A cut is a render of a sequence, or of part of one, that you upload for them. They see the cuts, and what’s said through their link, and nothing else of the project. What they say comes to the project’s comments, at its moment in the sequence.

To share the project itself, for someone with an account to open it in the editor, see Share a project.

Make a review link

  1. In the editor, click Share in the top bar, then Review links. Or choose Review links… in the command palette.
  2. Click New link, unless the project has none yet.
  3. Give it a Name, such as who it’s for. Those with the link see it.
  4. Choose how long it Lasts: 7, 30 or 90 days, or Until it’s deleted.
  5. Choose what those with it can do. Comments lets them comment and reply. Approvals lets them approve each cut, request changes to it or reject it. Downloads lets them download the cuts. With comments and approvals off, the link is for watching.
  6. To ask for a password, turn on Password and type one of at least 6 characters. Send it apart from the link.
  7. Click Make link.

The link is copied, ready to paste into an email or a message. Those with it see each cut as it’s uploaded, so you can make the link before there are any.

On the projects page, choose Share… from a project’s menu, then Review links, to see its links and cuts. Cuts are uploaded from the editor.

Upload a cut

  1. Under Cuts, click Upload a cut….
  2. With more than one sequence, choose the Sequence.
  3. Choose What to upload: The whole sequence, or From in to out, the stretch between its in and out points. Mark them first, with I and O.
  4. Choose the Quality: Standard is at most 720 pixels on its shorter side, High at most 1080, and neither is larger than the sequence. The size it’ll be about is shown under them.
  5. Click Render and upload.

The cut is rendered in this browser, as an MP4 video that plays in any browser, then uploaded. Keep the project open until it’s rendered. Then you can close the dialog, go on editing, or open another project, but keep the tab open until it’s up. Offline, it waits, and goes on once you’re back. Cuts are numbered in turn: Cut 1, Cut 2, and so on.

Click Stop to stop it; what’s been sent is deleted. To take a cut down, click Delete beside it, then Delete cut. Those with a link can’t watch it any more, and the comments on it stay with the project, at their moments in its sequence.

Each link shows when it runs out, when it was last opened, and how many people have given their name in it. Each cut shows who’s approved it, requested changes to it or rejected it, through any of the links.

  • Copy link copies its address again.
  • Change changes its name, how long it lasts from now, what those with it can do, and its password. Leave the password empty to keep the one it has.
  • Renew… shows on a link that’s run out: choose how long it’s to last from now. It opens again at the same address.
  • Make a new address…, under Change, stops the address it has from working. Send the new one to whoever’s to have it. Do this when a link has gone further than it should.
  • Delete stops it working at once. The comments made through it stay with the project.

Watch and comment

Those you send a link to open it in a browser, signed in or not. A link with a password asks for it first, once in each browser.

The newest cut shows first. Choose another from the list at the top, if there’s more than one, and a note says when a newer one is up. The time under the picture shows hours, minutes, seconds and frames, such as 00:00:13:05.

To comment:

  1. Pause where something should change, and write what in the box under the picture. The comment is pinned to the frame showing as you begin. To say something about the whole cut, click Whole cut first.
  2. To show it, click Draw, choose a tool, a color and a thickness, and draw over the picture. Click Done, or press Esc.
  3. Click Comment, or press CtrlEnter.

The first time, it asks for your name, to show by your comments. This browser keeps it for the link. Click your name at the top to change it.

Beside the picture are the comments made through the link on the cut showing, in the order they’re in it, with the team’s replies. Each thread is marked on the bar under the picture. Click one to go to its frame, paused, with what was drawn over the picture. Under them, the other cuts with comments say how many: click one to watch that cut. Comments on a cut that’s been taken down are kept at the bottom, folded.

  • Reply writes in a thread.
  • Resolve marks a thread you started as dealt with, and Reopen puts it back. Show All, Open or Resolved above the list.
  • Edit, and Delete comment or Delete reply, from a comment’s More menu, change or delete your own.
  • Download this cut is there when the link allows it.

A link that’s run out says so, and opens again once it’s renewed. A link to a project in the trash is paused until it’s restored.

Approve, request changes or reject

When the link allows it, those with it can say how each cut stands, beside the picture:

  1. Choose Approve, Request changes or Reject.
  2. Add a note, if you like: what should change, or why it isn’t right. To show where, comment on its frames too.
  3. Click the button with what you chose, or press CtrlEnter. Esc cancels.

The first time, it asks for your name, as for a comment. Whoever made the link is told, and it’s shown by the cut in the editor.

Each person decides once on each cut. Click Change… to decide again, or Take back to take it back. What the others with the link have decided on the cut is under yours. A newer cut is decided on by itself: a decision on an earlier one stays with that one.

With approvals turned off for the link, what’s been decided is still shown, but can’t be changed.

What changed since the cut before

Beside a cut, What changed since Cut 1 (or whichever came before) lists what’s different, in plain words, in the order you’d meet it watching: a shot added or taken out, moved or trimmed, a part cut out of one, what follows moved up, a title’s words changed, a look or effects put on or taken off, a sound made louder or quieter, the cut made longer or shorter. Click one to go to it.

Compare shows the cut before under a wipe across the picture. Drag the handle in the middle, or use ← and → on it, to show more of one or the other. The two play together, the cut before at the same moment of what’s in both, so a shot moved later in the new cut is shown where it was in the old one. Its sound is off: what you hear is the cut you’re watching.

It knows what changed because Oryvio made both cuts: each is uploaded with an account of what’s in it, without the names of files or tracks. Cuts uploaded before this was added don’t have one, so nothing’s listed for them.

Sign-off certificates

When someone approves a cut, they get a sign-off certificate, linked from their approval as Sign-off certificate. It’s also linked in the editor, beside their decision under Review, and in the email saying they approved it. Its page says:

  • who approved which cut of which project, through which link, and when, with their note;
  • the file they approved: its size, frame rate and length, and its fingerprint, the SHA-256 of the exact file;
  • that it’s signed by Oryvio, and the signature checks out.

To check that a file you have is the one approved, drop it on the certificate’s page, or click Choose a file. It’s read on your computer, a part at a time, and never uploaded. The page says whether it’s the same file, byte for byte.

Print, or save as PDF keeps a copy of the page. Download the signed certificate saves a file with what’s signed, the signature and the key, so anyone can check it without Oryvio: the signature is Ed25519, over the certificate as canonical JSON, with the key published at /.well-known/oryvio-signoff-key.json.

If they change their decision, or take it back, the certificate is withdrawn: its page still says what was approved, and when, and that it was taken back. Approving again gives a new one. A certificate stays when its cut is deleted, and still checks copies of its file. It’s deleted with its project.

Keys

KeysWhat they do
Space or KPlay or pause
← and →Back or on a frame
Shift← and Shift→Back or on a second
Home and EndGo to the start or the end
FFull screen
MMute
CWrite a comment
DDraw over the picture
CtrlZUndo the last mark, while drawing
EscStop drawing

Screen live

Screen what you’re editing to those with a link, live: they watch what you play in the editor as you play it, and write notes at the moment they see. It’s sent from your computer to theirs, peer to peer and encrypted, and isn’t uploaded or kept.

  1. In the editor, click Share in the top bar, then Review links. Or choose Review links… in the command palette.
  2. Beside the link, click Screen live. Live shows in the top bar, with how long it’s been live and how many are watching.
  3. Send the link, or click Live and Copy the link. Those who open it see “… is screening it live now” at the top of the review, and Watch live.
  4. Play, pause, scrub and edit as you do. They see the viewer as you see it, with its sound, and its timecode beside it. Open another sequence and they see that one; open another project, or leave the editor, and the screening ends.
  5. Click Live, then End screening, or click End screening beside the link. Closing the tab ends it too.

Click Live to see who’s watching, by the names they gave, and whether each has the picture yet. What they hear is the sequence’s mix as it plays: turning the volume down or muting the editor doesn’t change it. The picture is the viewer as it’s drawn, so a bigger viewer sends a sharper one.

A note written while it’s screened is at the moment they began writing it, which its button shows. It comes to the project’s comments at that moment in the sequence, marked Client, through the link, while it was screened live. Reply to it there, as to any. With comments turned off for the link, they can watch but not write.

To screen, you need a project saved to your account, and a link that hasn’t run out, and to be someone who can make review links. Through a link with a password, they give the password first.

If they can’t connect

The picture goes straight from your computer to theirs, so the networks between need to let it. Most do. Some company or school networks, VPNs and firewalls don’t, and those watching through one see that it couldn’t connect: they can try another network, or you can upload a cut for the link instead.

In the editor

Comments made through a review link are in the project’s comments, with the team’s. Each is marked Client, with the link and the cut it was made through, and is at its moment in the sequence the cut was made from: click it to go to that frame. Reply to them there, and those with the link see the reply. Resolve them, or delete them, as any other.

What clients decide of the cuts is in the editor too. Review in the top bar says how the newest cut stands: rejected, changes requested or approved, and by how many. Click it to see each client’s latest decision, with their note, the cut and the link it was made through, and whether a newer cut has been uploaded since. In a workspace, or a project shared with people, that’s under the team’s review. A project of your own, not shared, shows Review once a client has decided on a cut.

Making and deleting links, uploading cuts, and decisions made and taken back, show in the project’s activity.

When feedback’s due

Give a link a date under Feedback due, when you make it or later. Those with the link see “Feedback due” and the date at the top of the review, and the link’s row says Due with the date, or Was due once it’s passed.

If the day ends with nothing come through the link, you’re emailed, once: when it asks for approvals and no one’s decided on the project’s newest cut, or, when it doesn’t, no one’s commented. Move the date, and you’re emailed again when the new one comes. A link that’s run out, or a project in the trash, isn’t reminded of.

The date is the end of that day where you are. Leave Feedback due empty for no date.

Emails

Whoever made a link is emailed when someone comments through it, at most once every 15 minutes for each link, and when someone approves a cut through it, requests changes to it or rejects it. Someone who replies in a thread, or started it, is emailed about the replies after theirs, as for any comment. Turn them off in Settings, under Notifications: Reviews for comments and decisions through a link, Replies for replies.

Who can make them

Anyone who can share a project can make its review links and upload its cuts, once their email address is verified. In a workspace, those are its owners and editors, unless its owners don’t let its editors.

Limits

  • A project can have up to 20 review links and 30 cuts. On the free plan, up to 3 links can be live at a time, over all your projects, and they can’t ask for approvals: see Plans.
  • A cut can be up to 4 GB and a day long. It counts toward the storage of the project’s owner, or its workspace, from when it begins uploading: see Plans.
  • A link’s name can be at most 80 characters, and the name someone gives at most 60.
  • A password is 6 to 200 characters.
  • A comment can say up to 4,000 characters, and have up to 64 marks.
  • A note with a decision can say up to 1,000 characters.
  • A screening can have up to 20 watching at once. You can screen through up to 3 links at once, from different tabs or computers. A link has one screening at a time: starting another through it ends the one before. A screening ends after 6 hours, or when Oryvio hasn’t heard from the editor for 45 seconds.

Comments and decisions through a link send the name its person gives, and what they say and decide, to Oryvio. Screening live sends Oryvio only what the two computers need to find each other, including their IP addresses, which it passes on and doesn’t keep; each computer learns the other’s. See the Privacy policy for how Oryvio handles it.